Bilingual producer/AD, DP/ACs, sound and DIT—engineered for dense urban moves and night‑friendly waterfront ops from the Bund to Lujiazui, Jing'an and the West Bund.
We plan clusters (Bund↔Lujiazui, Jing'an lanes, West Bund) to reduce unit moves and parking friction.
We file the right item—elevated roads filming vs ground‑road occupation—with realistic buffers.
Studios and equipment rental near set; bilingual ACs and DITs align with your camera brand.
Nationwide escalation available: China Video Production Fixer.
| Dept | Roles | Notes |
|---|---|---|
| Production | Producer/Line Producer (EN/CN), 1st AD, PM, PA | Permits, call sheets, traffic & pedestrian plans. |
| Camera | DP, 1st AC, 2nd AC, DIT/Data, Utility | Lens tests, wireless video, color‑managed proxies. |
| G&E | Gaffer, Best Boy, Key Grip, Grip | Low‑profile LED packages for elevators & riverfront. |
| Sound | Mixer, Boom Op | Dual‑system with multilingual interview workflows. |
| Talent | HMU, Wardrobe, Props | Street selects and casting as required. |
| Aerial | UAV Pilot + VO | UOM registration and controlled‑airspace filings. |
| Activity | Authority | Reference Lead Time | Notes |
|---|---|---|---|
| Filming on elevated roads | PSB Traffic Police (Elevated Roads item) | Apply ≥15 working days before activity | Strict safety basis; supervised windows only. |
| Occupying ground roads/sidewalks for filming | District PSB Traffic Police | File in advance (commitment decisions can be rapid once materials complete) | Tripods, lighting, frames on public way require approval. |
| UAV flights (urban) | CAAC UOM platform | 3–10 working days typical | Real‑name registration; controlled airspace approvals via UOM. |
Need a permit strategist? Shanghai Video Production Fixer.
| Window | Weather | Production Note |
|---|---|---|
| Mar–May | Mild, flowering | Prime for exteriors; plan wind cover on bridges. |
| Jun–Jul | Meiyu (plum‑rain) | Canopies/alternates; protect cables and distro. |
| Late Aug–Mid‑Sep | Typhoon‑prone | Pad contingency days; monitor riverfront closures. |
| Oct–Nov | Crisp, clear | High demand around National Day (Oct 1–8). |
| Dec–Feb | Cold, damp | Short daylight; prioritize interiors. |
Crew demand and rates tighten near these dates—soft‑hold early.
Cones, barricades, cable ramps and signage; marshals for crossings.
Rain covers, sandbags, waterproof distro; lightning and typhoon thresholds.
Crew badges, vendor NDAs, call‑and‑hold for extras/talent.
Brief: contrast heritage façades with modern skyline. A‑unit ran interviews and interiors in Jing'an while B‑unit captured Bund plates and a legal corridor for aerials. Road‑use filings covered tripods and cones; we wrapped on schedule with bilingual deliverables.
Services: Location & Permits · Production Coordination · Equipment Rental · Casting · Aerial / FPV · Post‑Production