Bilingual G&E teams, compact urban load-outs and compliant road-use filings—optimized for riverside, CBD and high-rise moves.
Need lighting too? See Shanghai Lighting Rental or Equipment Rental.
| Vehicle | Typical Window | Notes |
|---|---|---|
| Small van / box (local plate) | Night / off‑peak preferred | Central districts restrict freight vehicles by day; use night windows and pre‑cleared bays. |
| Light/mini vans on expressways | 00:00–05:00 (policy example) | City policy has allowed certain local light vans on urban expressways at night; confirm current rule before routing. |
| Grip truck (outer ring ingress) | After 20:00 or early AM | Plan staging outside restricted corridors; load‑in via freight elevators with protection and marshals. |
Always verify day‑of restrictions in the Shanghai Traffic Police app. Our producers handle routing and holds.
| Activity | Authority | Reference Lead Time | Notes |
|---|---|---|---|
| Road/sidewalk occupation | Traffic Police (by district) | Apply ≥15 working days ahead; decision steps can be 1–2 working days after materials complete | Tripods, frames, lighting on public way require approval. |
| Elevated roads | Elevated Roads Brigade | ≥15 working days | Strict safety basis; supervised windows only. |
Need help? China Production Fixer · Shanghai Fixer
| Topic | Guideline |
|---|---|
| Line voltage | 220V / 50Hz (standard). We balance circuits and use certified distro. |
| Tie‑in | Qualified electrician only; advance with property/FM. Portable generators available. |
| Rigging | Use protection for floors/elevators; speedrail for safe overheads; barricades for public areas. |
| Safety | Wet weather covers, cable ramps, reflective PPE; fire watch as required. |
Coordinated with Production Coordination and Location & Permits.
Mid‑June to early July sees unpredictable showers and humidity; add canopies and alternates.
Late August to mid‑September may bring typhoon systems; plan contingency days and protected routes.
We split a day between a CBD tower and Bund riverfront. Night load‑in via freight; road‑use filing covered stands and cones. Result: 12‑hour day with zero overtime and clean night plates.
More services: Equipment Rental · Location & Permits · Production Coordination